Acting as the client’s construction manager, this project was an “in-situ” renovation to key team and collaboration zones within the Sid Lee offices. Scope of work included the replacement and installation of all new modular furniture on the ground floor, a new café/lounge area and resurfacing of high-end millwork and the addition of significant biophilic “greenery” throughout the space. New acoustic baffles were installed in all

boardrooms and meeting rooms designed to not only be functional but also to add some aesthetics to the open ceiling, along with new lighting throughout.

Address:

952 Queen Street West, Toronto

Floors:

Ground and Upper Mezzanine

Square Footage:

40,000 sf

Duration:

6 months

Prime Consultant

Atelier Zébulon Perron